N. Absi, Modélisation et résolution de problèmes de lot-sizing à capacité finie, Thèse de doctorat, 2005.

A. Amiri, Designing a distribution network in a supply chain system: Formulation and efficient solution procedure, European Journal of Operational Research, vol.171, issue.2, pp.567-576, 2006.
DOI : 10.1016/j.ejor.2004.09.018

N. Ascheuer, M. Grötschel, and A. A. Hamid, Order picking in an automatic warehouse: Solving online asymmetric TSPs, Mathematical Methods of Operations Research (ZOR), vol.49, issue.3, pp.501-515, 1999.
DOI : 10.1007/s001860050064

S. Axsäter and W. Zhang, A joint replenishment policy for multi-echelon inventory control, International Journal of Production Economics, vol.59, issue.1-3, pp.243-250, 1999.
DOI : 10.1016/S0925-5273(98)00018-8

P. Baptiste, M. Flamini, and F. Sourd, Lagrangian bounds for just-in-time job-shop scheduling, Computers & Operations Research, vol.35, issue.3, pp.906-915, 2008.
DOI : 10.1016/j.cor.2006.05.009

URL : https://hal.archives-ouvertes.fr/hal-01185207

P. Baptiste and M. Y. , Maknoon : Cross-docking : scheduling of incoming and outgoing semi trailers, 19th International Conference on Production Research, p.6, 2009.

J. F. Bard and N. Nananukul, The integrated production???inventory???distribution???routing problem, Journal of Scheduling, vol.177, issue.2, pp.257-280, 2009.
DOI : 10.1007/978-1-4615-6089-0

J. J. Bartholdi and K. R. Gue, The Best Shape for a Crossdock, Transportation Science, vol.38, issue.2, pp.235-244, 2004.
DOI : 10.1287/trsc.1030.0077

G. Belvaux and L. A. , Wolsey : Modelling practical lot-sizing problems as mixed integer programs, Management Science, vol.37, issue.7, pp.993-1007, 2001.
DOI : 10.1287/mnsc.47.7.993.9800

URL : http://dial.uclouvain.be/downloader/downloader.php?pid=boreal:4098&datastream=PDF_01&disclaimer=70ff1a3c49edc7d971beedead9139ef0faab82a8d9dad5524ac189796b0c74bc

P. J. Billington, J. O. Mcclain, and L. J. Thomas, Heuristics for Multilevel Lot-Sizing with a Bottleneck, Management Science, vol.32, issue.8, pp.989-1006, 1986.
DOI : 10.1287/mnsc.32.8.989

A. Billionnet, Integer programming to schedule a hierarchical workforce with variable demands, European Journal of Operational Research, vol.114, issue.1, pp.105-114, 1999.
DOI : 10.1016/S0377-2217(98)00182-9

URL : https://hal.archives-ouvertes.fr/hal-01124496

J. Blazewicz, W. Cellary, R. Slowinski, and J. Weglarz, Scheduling under resource constraints ? deterministic models The Netherlands, Annals of Operations Research, pp.989-1006, 1986.

J. Blazewicz, M. Dror, and J. Weglarz, Mathematical programming formulations for machine scheduling: A survey, European Journal of Operational Research, vol.51, issue.3, pp.283-300, 1991.
DOI : 10.1016/0377-2217(91)90304-E

J. Blazewicz, J. K. Lenstra, and A. H. Kan, Scheduling subject to resource constraints: classification and complexity, Discrete Applied Mathematics, vol.5, issue.1, pp.11-24, 1983.
DOI : 10.1016/0166-218X(83)90012-4

URL : https://doi.org/10.1016/0166-218x(83)90012-4

K. Bülbül, P. Kaminsky, and C. Yano, Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs, Naval Research Logistics (NRL), vol.26, issue.1-4, pp.407-444, 2004.
DOI : 10.1016/0167-6377(96)00033-8

K. Bülbül, P. Kaminsky, and C. Yano, Preemption in single machine earliness/tardiness scheduling, Journal of Scheduling, vol.52, issue.2, pp.271-292, 2007.
DOI : 10.1007/978-1-4615-6329-7

N. Boysen, M. Fliedner, and A. Scholl, Scheduling inbound and outbound trucks at cross docking terminals, OR Spectrum, vol.53, issue.7, pp.135-161, 2010.
DOI : 10.1007/s00291-008-0139-2

URL : http://www.wiwi.uni-jena.de/papers/wp-jbe200717.pdf

P. Brandimarte and M. Calderini, A heuristic bi-criterion approach to integrated process plan selection and job shop scheduling, International Journal of Production Research, vol.66, pp.161-181, 1995.

A. P. Brown and Z. A. Lomnicki, Some Applications of the ???Branch-and-Bound??? Algorithm to the Machine Scheduling Problem, Journal of the Operational Research Society, vol.17, issue.2, pp.173-186, 1966.
DOI : 10.1057/jors.1966.25

P. Brucker, Scheduling Algorithms, 1995.

P. Brucker, A. Drexl, and R. , Resource-constrained project scheduling: Notation, classification, models, and methods, European Journal of Operational Research, vol.112, issue.1, pp.3-41, 1999.
DOI : 10.1016/S0377-2217(98)00204-5

M. Cagri, K. Moinzadeh, and Y. Zhou, Coordinated replenishment strategies in inventory/distribution systems, Management Science, vol.57, issue.2, pp.293-307, 2007.

L. E. Cárdenas-barrón, Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note, Transportation Research Part E: Logistics and Transportation Review, vol.43, issue.5, pp.647-654, 2007.
DOI : 10.1016/j.tre.2005.09.011

J. Carlier, Problèmes d'ordonnancement à contraintes de ressources : Algorithmes et complexité, 1984.

J. Carlier, A. Moukrim, and H. Xu, The project scheduling problem with production and consumption of resources: A list-scheduling based algorithm, Discrete Applied Mathematics, vol.157, issue.17, pp.3631-3642, 2009.
DOI : 10.1016/j.dam.2009.02.012

J. Carlier and A. H. Kan, Scheduling subject to nonrenewable-resource constraints, Operations Research Letters, vol.1, issue.2, pp.52-55, 1982.
DOI : 10.1016/0167-6377(82)90045-1

S. Carrera, K. Chami, R. Guimaraes, and M. C. Portmann, Ramdane Cherif : Negotiation models for logistic platform planning and scheduling, Eleventh International Workshop on Project Management and Scheduling, PMS 2008, Turquie. Proceedings, pp.43-46, 2008.

S. Carrera and M. C. Portmann, Ramdane Cherif : Outils d'aide à la décision pour le lissage de charges des plateformes logistiques, Congrès International de Génie Industriel, p.8, 2009.

S. Carrera, M. C. Portmann, and W. R. Cherif, Scheduling problems for logistic platforms with fixed staircase component arrivals and various deliveries hypotheses, Lecture Notes in Management Science, Proceedings of the 2th International Conference on Applied Operational Research -ICAOR, pp.517-528, 2010.
URL : https://hal.archives-ouvertes.fr/inria-00523289

S. Carrera and M. C. Portmann, Ramdane Cherif : Scheduling supply chain node with fixed components arrivals and two partially flexible deliveries, 5th International Conference on Management and Control of Production and Logistics -MCPL, Coimbra, Portugal. Proceedings, p.6, 2010.

]. P. Chandra, A Dynamic Distribution Model with Warehouse and Customer Replenishment Requirements, Journal of the Operational Research Society, vol.44, issue.7, pp.681-692, 1993.
DOI : 10.1057/jors.1993.117

P. Chandra and M. L. Fisher, Coordination of production and distribution planning, European Journal of Operational Research, vol.72, issue.3, pp.503-517, 1994.
DOI : 10.1016/0377-2217(94)90419-7

Y. Chang and C. Lee, Machine scheduling with job delivery coordination, European Journal of Operational Research, vol.158, issue.2, pp.470-487, 2004.
DOI : 10.1016/S0377-2217(03)00364-3

L. Che and V. J. Leon, Power-of-two single-warehouse multi-buyer inventory coordination with private information, International Journal of Production Economics, vol.111, issue.2, pp.562-574, 2008.
DOI : 10.1016/j.ijpe.2006.12.063

F. Chen and C. Lee, Minimizing the makespan in a two-machine cross-docking flow shop problem, European Journal of Operational Research, vol.193, issue.1, pp.59-72, 2009.
DOI : 10.1016/j.ejor.2007.10.051

P. Chen, Y. Guo, A. Lim, and B. Rodrigues, Multiple crossdocks with inventory and time windows, Computers & Operations Research, vol.33, issue.1, pp.43-63, 2006.
DOI : 10.1016/j.cor.2004.06.002

Z. Chen, Integrated Production and Distribution Operations, 2004.
DOI : 10.1007/978-1-4020-7953-5_17

Z. Chen and G. L. , Integrated Scheduling of Production and Distribution Operations, Management Science, vol.51, issue.4, pp.614-628, 2005.
DOI : 10.1287/mnsc.1040.0325

Z. L. Chen, Order Assignment and Scheduling in a Supply Chain, Operations Research, vol.54, issue.3, pp.555-572, 2006.
DOI : 10.1287/opre.1060.0280

D. Chhajed, A fixed interval due-date scheduling problem with earliness and due-date costs, European Journal of Operational Research, vol.84, issue.2, pp.385-401, 1995.
DOI : 10.1016/0377-2217(93)E0291-5

URL : https://www.ideals.illinois.edu/bitstream/2142/29372/2/fixedintervaldue91171chha.pdf

S. Chopra and P. Meindl, Supply Chain Management : strategy, planning and operations. Pearson Education, 2007.

M. Cochand, D. De-werra, and R. Slowinski, Preemptive scheduling with staircase and piecewise linear resource availability, ZOR Zeitschrift f???r Operations Research Methods and Models of Operations Research, vol.30, issue.5, pp.297-313, 1989.
DOI : 10.1145/322092.322101

R. W. Conway, W. L. Maxwell, and L. W. , Miller : Theory of scheduling, 1967.

J. B. Dauzère-pérès, On the importance of sequencing decisions in production planning and scheduling, International Transactions in Operational Research, vol.9, issue.6, pp.779-793, 2002.
DOI : 10.1111/1475-3995.00388

R. De-koster, T. Le-duc, and K. J. , Design and control of warehouse order picking: A literature review, European Journal of Operational Research, vol.182, issue.2, pp.481-501, 2007.
DOI : 10.1016/j.ejor.2006.07.009

R. De-koster, E. S. Van-der-poort, and M. , Efficient orderbatching methods in warehouses, International Journal of Production Research, vol.37, issue.7, pp.1479-1504, 1999.
DOI : 10.1080/002075499191094

D. De-werra, A decomposition property of polyhedra, Mathematical Programming, pp.261-266, 1984.
DOI : 10.1007/BF02591932

A. Drexl, Lot sizing and scheduling ??? Survey and extensions, European Journal of Operational Research, vol.99, issue.2, pp.221-235, 1997.
DOI : 10.1016/S0377-2217(97)00030-1

A. T. Ernst, H. Jiang, M. K. Moorthy, B. Owens, and D. , Sier : An annotated bibliography of personnel scheduling and rostering The Netherlands, Annals of Operations Research, pp.21-144, 2004.

J. Erschler and B. Grabot, Gestion de production, 2001.

B. Esteve, C. Aubijous, A. Chartier, and V. , A recovering beam search algorithm for the single machine Just-in-Time scheduling problem, European Journal of Operational Research, vol.172, issue.3, pp.798-813, 2006.
DOI : 10.1016/j.ejor.2004.11.014

URL : https://hal.archives-ouvertes.fr/hal-00803280

M. Fisher, Optimal Solution of Scheduling Problems Using Lagrange Multipliers: Part I, Operations Research, vol.21, issue.5, pp.1114-1127, 1973.
DOI : 10.1287/opre.21.5.1114

J. Fondrevelle, Résolution exacte de problèmes d'ordonnancement de type flowshops de permutation en présence de contraintes d'écarts temporels entre opérations, Thèse de doctorat, 2005.

M. S. Fox, M. Barbuceanu, and R. Teigen, Agent-Oriented Supply-Chain Management, International Journal of Flexible Manufacturing Systems, vol.12, pp.165-188, 2000.
DOI : 10.1007/978-1-4615-1599-9_5

L. Franchini, E. Caillaud, P. Nguyen, and G. Lacoste, Workload control of human resources to improve production management, International Journal of Production Research, vol.39, issue.7, pp.1385-1403, 2001.
DOI : 10.1080/00207540010022322

URL : https://hal.archives-ouvertes.fr/hal-01703124

A. J. Gademann and S. Van-de-velde, Order batching to minimize total travel time in a parallel-aisle warehouse, IIE Transactions, vol.33, issue.1, pp.63-75, 2005.
DOI : 10.1016/0167-6377(96)00033-8

A. J. Gademann, J. P. Van-den-berg, and H. H. , Van der Hoff : An order batching algorithm for wave picking in a parallel-aisle warehouse, IIE Transactions, vol.33, issue.5, pp.385-398, 2001.
DOI : 10.1023/A:1011049113445

E. R. Gafarov and A. A. , Lazarev : Single machine scheduling with a non-renewable financial resource, 2010.

R. Ganeshan, Managing supply chain inventories: A multiple retailer, one warehouse, multiple supplier model, International Journal of Production Economics, vol.59, issue.1-3, pp.341-354, 1999.
DOI : 10.1016/S0925-5273(98)00115-7

URL : http://www.business.wm.edu/Ram.Ganeshan/pdfs/ijpe1999.pdf

M. R. Gary and S. S. Johnson, Computers and Intractability, A guide to the Theory of NP-Completeness, 1979.

M. Gen, Hybrid genetic algorithm for multi-time period production/distribution planning, Computers & Industrial Engineering, vol.48, issue.4, pp.799-809, 2005.
DOI : 10.1016/j.cie.2004.12.012

I. Giannoccaro and P. Pontrandolfo, A fuzzy echelon approach for inventory management in supply chains, European Journal of Operational Research, vol.149, issue.1, pp.185-196, 2003.
DOI : 10.1016/S0377-2217(02)00441-1

V. Giard and G. Mendy, Scheduling coordination in a supply chain using advance demand information, Production Planning & Control, vol.33, issue.171, pp.655-667, 2008.
DOI : 10.1080/0020754042000298520

F. Glover, Tabu Search: A Tutorial, Interfaces, vol.20, issue.4, pp.74-94, 1990.
DOI : 10.1287/inte.20.4.74

M. Govil and J. M. , Proth : Supply Chain Design and Management, J.D. Irwin, 2002.

R. L. Graham, E. L. Lawler, J. K. Lenstra, and A. H. Kan, Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals of Discrete Mathematics, vol.5, pp.287-326, 1979.
DOI : 10.1016/S0167-5060(08)70356-X

D. L. Gresh, D. P. Connors, J. P. Fasano, and R. J. Wittrock, Applying supply chain optimization techniques to workforce planning problems, IBM Journal of Research and Development, vol.51, issue.3.4, pp.3-4251, 2007.
DOI : 10.1147/rd.513.0251

URL : http://www.research.ibm.com/journal/rd/513/gresh.pdf

J. Gu, M. Goetschalckx, and L. F. Mcginnis, Research on warehouse operation: A comprehensive review, European Journal of Operational Research, vol.177, issue.1, pp.1-21, 2007.
DOI : 10.1016/j.ejor.2006.02.025

A. Gunasekaran, Performance measures and metrics in logistics and supply chain management: a review of recent literature (1995???2004) for research and applications, International Journal of Production Research, vol.32, issue.12, pp.2819-2840, 2007.
DOI : 10.1108/09600030210442595

A. Gunasekaran, D. K. Macbeth, and R. Lamming, Modelling and analysis of supply chain management systems: an editorial overview, Journal of the Operational Research Society, vol.51, issue.10, pp.1112-1115, 2000.
DOI : 10.1057/palgrave.jors.2601038

A. Gunasekaran, C. Patel, and R. E. Mcgaughey, A framework for supply chain performance measurement, International Journal of Production Economics, vol.87, issue.3, pp.333-347, 2004.
DOI : 10.1016/j.ijpe.2003.08.003

J. N. Gupta-et-jr and E. F. Stafford, Flowshop scheduling research after five decades, European Journal of Operational Research, vol.169, issue.3, pp.669-711, 2006.

N. G. Hall, M. Lesaoana, and C. N. Potts, Scheduling with Fixed Delivery Dates, Operations Research, vol.49, issue.1, pp.134-144, 2001.
DOI : 10.1287/opre.49.1.134.11192

N. G. Hall and C. N. Potts, Supply Chain Scheduling: Batching and Delivery, Operations Research, vol.51, issue.4, pp.566-584, 2003.
DOI : 10.1287/opre.51.4.566.16106

N. G. Hall and C. N. Potts, The coordination of scheduling and batch deliveries The Netherlands, Annals of Operations Research, pp.41-64, 2005.

R. Hassin and M. Shani, Machine scheduling with earliness, tardiness and non-execution penalties, Computers & Operations Research, vol.32, issue.3, pp.683-705, 2005.
DOI : 10.1016/j.cor.2003.08.012

D. J. Hatfield and J. F. , Pierce : On the application of combinatorial programming to a class of single stage sequencing problems. Working paper, 1966.

Y. Hendel and F. Sourd, An improved earliness???tardiness timing algorithm, Computers & Operations Research, vol.34, issue.10, pp.2931-2938, 2007.
DOI : 10.1016/j.cor.2005.11.004

URL : https://hal.archives-ouvertes.fr/hal-01185216

S. S. Heragu, L. Du, R. J. Mantel, and P. C. Shuur, Mathematical model for warehouse design and product allocation, International Journal of Production Research, vol.22, issue.2, pp.327-338, 2005.
DOI : 10.1080/07408179608966285

F. Hnaien, Gestion des stocks dans des chaînes logistiques face aux aléas des délais d'approvisionnements, Thèse de doctorat, Ecole Nationale Supérieure des Mines de Saint- Etienne, 2008.

R. Hung, Single-shift off-day scheduling of a hierarchical workforce with variable demands, European Journal of Operational Research, vol.78, issue.1, pp.49-57, 1994.
DOI : 10.1016/0377-2217(94)90121-X

S. M. Johnson, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, vol.1, issue.1, pp.61-68, 1954.
DOI : 10.1002/nav.3800010110

P. Kaminsky and O. Kaya, Inventory positioning, scheduling and lead-time quotation in supply chains, International Journal of Production Economics, vol.114, issue.1, pp.276-293, 2008.
DOI : 10.1016/j.ijpe.2008.02.006

M. Khouja, Optimizing inventory decisions in a multi-stage multi-customer supply chain, Transportation Research Part E: Logistics and Transportation Review, vol.39, issue.3, pp.193-208, 2003.
DOI : 10.1016/S1366-5545(02)00036-4

Y. J. Kim, Y. K. Kim, and Y. Cho, A heuristic-based genetic algorithm for workload smoothing in assembly lines, Computers & Operations Research, vol.25, issue.2, pp.99-111, 1998.
DOI : 10.1016/S0305-0548(97)00046-4

O. Koné, Nouvelles approches pour la résolution du problème d'ordonnancement de projet à moyens limités, Thèse de doctorat, 2009.

R. Larbi, G. Alpan, and P. Baptiste, Penz : Scheduling of transshipment operations in a single strip and stack doors crossdock, 19th International Conference on Production Research, p.6, 2007.

R. Larbi, G. Alpan, and B. Penz, Scheduling transshipment operations in a multiple inbound and outbound door crossdock, 2009 International Conference on Computers & Industrial Engineering, p.6, 2009.
DOI : 10.1109/ICCIE.2009.5223927

URL : https://hal.archives-ouvertes.fr/hal-00411570

V. Lauff and F. Werner, On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties, Computers & Operations Research, vol.31, issue.3, pp.317-345, 2004.
DOI : 10.1016/S0305-0548(02)00194-6

E. L. Lawler and D. E. Wood, Branch-and-Bound Methods: A Survey, Operations Research, vol.14, issue.4, pp.699-719, 1966.
DOI : 10.1287/opre.14.4.699

T. Le-duc, R. De, and . Koster, Travel time estimation and order batching in a 2-block warehouse, European Journal of Operational Research, vol.176, issue.1, pp.374-388, 2007.
DOI : 10.1016/j.ejor.2005.03.052

Y. H. Lee, J. W. Jung, and K. M. Lee, Vehicle routing scheduling for cross-docking in the supply chain, Computers & Industrial Engineering, vol.51, issue.2, pp.247-256, 2006.
DOI : 10.1016/j.cie.2006.02.006

L. Lei, S. Liu, A. Ruszczynski, and S. Park, On the integrated production, inventory, and distribution routing problem, IIE Transactions, vol.47, issue.11, pp.955-970, 2006.
DOI : 10.1287/mnsc.27.3.336

C. Li, G. Vairaktarakis, and C. Lee, Machine scheduling with deliveries to multiple customer locations, European Journal of Operational Research, vol.164, issue.1, pp.39-51, 2005.
DOI : 10.1016/j.ejor.2003.11.022

X. Li and Q. Wang, Coordination mechanisms of supply chain systems, European Journal of Operational Research, vol.179, issue.1, pp.1-16, 2007.
DOI : 10.1016/j.ejor.2006.06.023

A. Lim, Z. Miao, B. Rodrigues, and Z. Xu, Transshipment through crossdocks with inventory and time windows, Chwa et J.I. Munro LNCS, vol.3106, pp.122-131, 2004.

R. Manzini, M. Gamberi, and E. Gebennini, An integrated approach to the design and management of a supply chain system, The International Journal of Advanced Manufacturing Technology, vol.87, issue.3, pp.625-640, 2008.
DOI : 10.1016/j.im.2003.06.005

C. H. Martin, D. C. Dent, and J. Eckhart, Integrated production, distribution, and inventory planning at libbey-owens-ford. Interfaces, pp.68-78, 1993.
DOI : 10.1287/inte.23.3.68

H. Matsuo, The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization, Operations Research, vol.36, issue.2, pp.293-307, 1988.
DOI : 10.1287/opre.36.2.293

G. B. Mcmahon and P. G. Burton, Flow-Shop Scheduling with the Branch-and-Bound Method, Operations Research, vol.15, issue.3, pp.473-481, 1967.
DOI : 10.1287/opre.15.3.473

H. Meyr, M. Wagner, and J. Rohde, Structure of advanced planning systems Stadtler et C. Kilger, éditeurs : Supply Chain Management and Advanced Planning ? Concepts, Models Software and Case Studies, pp.99-104, 2002.

F. Mocellin, Gestion des entrepôts et plates-formes. Dunod : Integrated process planning and scheduling in a supply chain, Computers & Industrial Engineering, vol.54, pp.1048-1061, 2006.

Z. Mouloua, Ordonnancements coopératifs pour les chaînes logistiques, Thèse de doctorat , Institut National Polytechnique de Lorraine, 2007.

R. Narasimhan, An algorithm for single shift scheduling of hierarchical workforce, European Journal of Operational Research, vol.96, issue.1, pp.113-121, 1997.
DOI : 10.1016/S0377-2217(96)00364-5

M. Nawaz and E. E. , Enscore et I. Ham : A heuristic algorithm for the m-machine, n-job flow shop sequencing problem, Omega, vol.1, pp.91-95, 1983.

J. Orlicky, The successful Computer Systems : Its Planning, development, and management in a business enterprise, 1968.

L. Ouzizi, Planification par négociation dans un système de décision semi-distribué pour une entreprise en réseau, Thèse de doctorat, 2005.

L. Ozdamar, A hierarchical planning approach for a production-distribution system, International Journal of Production Research, vol.37, issue.16, pp.3759-3772, 1999.
DOI : 10.1080/002075499190031

J. H. Patterson, R. Slowinski, F. B. Talbot, and J. Weglarz, AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS, Advances in Project Scheduling, pp.3-28, 1989.
DOI : 10.1016/B978-0-444-87358-3.50005-5

C. G. Petersen and G. , A comparison of picking, storage, and routing policies in manual order picking, International Journal of Production Economics, vol.92, issue.1, pp.11-19, 2004.
DOI : 10.1016/j.ijpe.2003.09.006

M. Pidd, Just modelling through : a rough guide to modelling, Interfaces, vol.19, issue.2, pp.118-132, 1999.

M. Portmann, Méthodes de décomposition spatiales et temporelles en ordonnancement de la prodution, Thèse d'état Thèse de doctorat, 1987.

M. Portmann, Scheduling methodology : optimization and compu-search approaches I éditeur : The planning and scheduling of production systems, pp.271-300, 1997.

C. N. Potts, An adaptive branching rule for the permutation flow-shop problem, European Journal of Operational Research, vol.5, issue.1, pp.19-25, 1980.
DOI : 10.1016/0377-2217(80)90069-7

G. Pundoor and Z. Chen, Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost, Naval Research Logistics, vol.1, issue.6, pp.571-589, 2005.
DOI : 10.1007/978-1-4020-7953-5_17

H. D. Ratliff and A. S. Rosenthal, Order-Picking in a Rectangular Warehouse: A Solvable Case of the Traveling Salesman Problem, Operations Research, vol.31, issue.3, pp.507-521, 1983.
DOI : 10.1287/opre.31.3.507

A. Robert, Optimisation des batches de production, Thèse de doctorat, 2007.

K. J. Roodbergen and R. D. Koster, Routing methods for warehouses with multiple cross aisles, International Journal of Production Research, vol.39, issue.9, pp.1865-1883, 2001.
DOI : 10.1080/00207540110028128

B. Rouwenhorst, B. Reuter, V. Stockrahm, G. J. Van-houtum, R. J. Mantel et al., Warehouse design and control: Framework and literature review, European Journal of Operational Research, vol.122, issue.3, pp.515-533, 2000.
DOI : 10.1016/S0377-2217(99)00020-X

URL : https://pure.tue.nl/ws/files/4278451/522792.pdf

R. Sadykov, A polynomial algorithm for a simple scheduling problem at cross docking terminals, INRIA Research Report, 2009.
URL : https://hal.archives-ouvertes.fr/inria-00412519

F. Sahin and E. P. , Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research, Decision Sciences, vol.41, issue.9, pp.505-536, 2002.
DOI : 10.1016/0272-6963(95)00010-P

G. J. Salegna and P. S. Park, Workload smoothing in a bottleneck job shop, International Journal of Operations & Production Management, vol.16, issue.1, pp.91-110, 1996.
DOI : 10.1287/mnsc.19.9.1001

A. M. Sarmiento and R. Nagi, A review of integrated analysis of production-distribution systems, IIE Transactions, vol.4, issue.11, pp.1061-1074, 1999.
DOI : 10.1287/opre.34.5.803

S. U. Seçkiner, H. Gökçen, and M. Kurt, An integer programming model for hierarchical workforce scheduling problem, European Journal of Operational Research, vol.183, issue.2, pp.694-699, 2007.
DOI : 10.1016/j.ejor.2006.10.030

E. A. Silver, Operations Research in Inventory Management: A Review and Critique, Operations Research, vol.29, issue.4, pp.628-644, 1981.
DOI : 10.1287/opre.29.4.628

D. Simchi-levi, P. Kaminsky, and E. Simchi-levi, Designing and Managing the Supply Chain, 2003.

S. Sindhuchao, H. E. Romeijn, E. Akçali, and R. Boondiskulchok, An Integrated Inventory-Routing System for Multi-item Joint Replenishment with Limited Vehicle Capacity, Journal of Global Optimization, vol.2, issue.3, pp.93-118, 2005.
DOI : 10.1137/1.9780898718515

R. Slowinski, Preemptive scheduling of independent jobs on parallel machines subject to financial constraints, European Journal of Operational Research, vol.15, issue.3, pp.366-373, 1984.
DOI : 10.1016/0377-2217(84)90105-X

K. Song and F. Chen, Scheduling Cross Docking Logistics Optimization Problem with Multiple Inbound Vehicles and One Outbound Vehicle, 2007 IEEE International Conference on Automation and Logistics, pp.3089-3094, 2007.
DOI : 10.1109/ICAL.2007.4339113

F. Sourd, Ordonnancer Juste à temps. Mémoire d'habilitation à diriger des recherches, Thèse de doctorat, 2008.

F. Sourd, Kedad-Sidhoum : A faster branch-and-bound algorithm for the earlinesstardiness scheduling problem, Journal of Scheduling, vol.11, pp.533-549, 2003.

F. Sourd and S. Kedad-sidhoum, The one machine problem with earliness and tardiness penalties, Journal of Scheduling, vol.6, issue.6, pp.533-549, 2003.
DOI : 10.1023/A:1026224610295

H. Stadtler, Supply chain management and advanced planning??????basics, overview and challenges, European Journal of Operational Research, vol.163, issue.3, pp.575-588, 2005.
DOI : 10.1016/j.ejor.2004.03.001

G. Strack and Y. Pochet, An integrated model for warehouse and inventory planning, European Journal of Operational Research, vol.204, issue.1, pp.35-50, 2010.
DOI : 10.1016/j.ejor.2009.09.006

W. Tan, Integration of process planning and scheduling -a review, Journal of Intelligent Manufacturing, vol.11, issue.1, pp.51-63, 2000.
DOI : 10.1023/A:1008952024606

D. A. Taylor, Supply Chains : A Manager's Guide, 2003.

D. J. Thomas and P. M. Griffin, Coordinated supply chain management Erkip : Scheduling under a non-renewable resource constraint, European Journal of Operational Research Journal of the Operational Research Society, vol.94, issue.19, pp.1-15, 1991.

J. P. Van-den and . Berg, A literature survey on planning and control of warehousing systems, IIE Transactions, vol.16, issue.8, pp.751-762, 1999.
DOI : 10.1287/inte.20.4.74

J. P. Van-den and W. H. Berg, Zijm : Models for warehouse management : classification and examples, International Journal Production Economics, vol.59, issue.1-3, pp.519-528, 1999.

S. Viswanathan and K. Mathur, Integrating Routing and Inventory Decisions in One-Warehouse Multiretailer Multiproduct Distribution Systems, Management Science, vol.43, issue.3, pp.294-312, 1997.
DOI : 10.1287/mnsc.43.3.294

G. Wan and B. P. Yen, Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties, European Journal of Operational Research, vol.142, issue.2, pp.271-281, 2002.
DOI : 10.1016/S0377-2217(01)00302-2

B. D. Williams and T. Tokar, A review of inventory management research in major logistics journals, The International Journal of Logistics Management, vol.19, issue.2, pp.212-232, 2008.
DOI : 10.1002/j.2158-1592.2001.tb00159.x

P. Wirojanagud, S. E. Gel, and J. W. Fowler, Modelling inherent worker differences for workforce planning, International Journal of Production Research, vol.63, issue.3, pp.525-553, 2007.
DOI : 10.1016/S0377-2217(01)00056-X

C. Wolosewicz, Approche intégrée en planification et ordonnancement de la production, Thèse de doctorat, Ecole Nationale Supérieure des Mines de Saint-Etienne, 2008.

J. Xie, Polynomial algorithms for single machine scheduling problems with financial constraints, Operations Research Letters, vol.21, issue.1, pp.39-42, 1997.
DOI : 10.1016/S0167-6377(97)00007-2

X. Yang, Scheduling with generalized batch delivery dates and earliness penalties, IIE Transactions, vol.18, issue.8, pp.735-741, 2000.
DOI : 10.1287/moor.15.3.483

W. Yu, Operational Strategies for cross-docking systems, Thèse de doctorat, 2002.

W. Yu and P. J. , Scheduling of inbound and outbound trucks in cross docking systems with temporary storage, European Journal of Operational Research, vol.184, issue.1, pp.377-396, 2008.
DOI : 10.1016/j.ejor.2006.10.047