. Bibliographie and . Afnor, Norme européenne, AFNOR, 2001.

E. H. Aghezza, M. A. Jamali, and D. Ait-kadi, An integrated production and preventive maintenance planning model, European Journal of Operational Research, vol.181, issue.2, p.679685, 2007.

G. Arango, S. Hennequin, and N. Rezg, Fuzzy modeling and optimization of imperfect maintenance, Proceedings of International Conference on Industrial Engineering and Systems Management (IESM'07), 2006.

J. E. Baker, Reducing bias and inefficiency in the selection algorithm, Proceedings of the Second International Conference on Genetic Algorithms, p.1421, 1987.

E. Balas, A. Simonetti, and . Vazacopoulos, Job shop scheduling with setup times, deadlines and precedence constraints, Journal of Scheduling, vol.13, issue.2, p.253262, 2008.
DOI : 10.1007/978-1-4615-6329-7

R. Barlow and L. C. Hunter, Optimum Preventive Maintenance Policies, Operations Research, vol.8, issue.1, p.90100, 1960.
DOI : 10.1287/opre.8.1.90

R. E. Barlow and F. Proschan, Mathematical theory of reliability, 1965.
DOI : 10.1137/1.9781611971194

F. Benbouzid, Y. Bessadi, S. A. Guebli, C. Varnier, and N. Zerhouni, Résolution du problème de llordonnancement conjoint maintenance/production par la stratégie séquenteille, Proceedings of the 4 ème Conférence Francophone de MOdélisation et de SIMulation MOSIMM, 2003.

F. Benbouzid-sitayeb, C. Varnier, and N. Zerhouni, Résolution du problème de lordonnancement conjoint production/maintenance par colonies de fourmis, Proceedings of the 6 ème Conférence Francophone de MOdélisation et SIMulation (MOSIMMM), 2006.

M. Bennour, C. Bloch, and N. Zerhouni, Modélisation intégrée des activités de maintenance et de production, Proceedings of the 3 ème Conférence Francophone de MOdélisation et de SIMulation MOSIMMMM, 2001.

B. J. Coleman, TECHNICAL NOTE: A SIMPLE MODEL FOR OPTIMIZING THE SINGLE MACHINE EARLY/TARDY PROBLEM WITH SEQUENCE-DEPENDENT SETUPS, Production and Operations Management, vol.31, issue.1, p.225228, 1992.
DOI : 10.1111/j.1937-5956.1992.tb00354.x

D. Cox, Regression Models and Life-Tables, Journal of the Royal Statistical Society, vol.34, issue.2, p.187220, 1972.
DOI : 10.1007/978-1-4612-4380-9_37

I. T. Dedopoulos and Y. Smeers, An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failures, Computers & Industrial Engineering, vol.34, issue.3, p.643654, 1998.
DOI : 10.1016/S0360-8352(97)00281-7

R. Dekker, Application of maintenance optimization models: a review and analysis, Reliability Engineering and System Safety, p.229240, 1996.

S. Dellagi, Développement de stratégies de maintenance dans un contexte de sous-traitance partielle de production, Thèse de doctorat, 2006.

. Doyen, L. Doyen, and O. Gaudoin, Classes of imperfect repair models based on reduction of failure intensity or virtual age, Reliability Engineering & System Safety, vol.84, issue.1, p.4556, 2004.
DOI : 10.1016/S0951-8320(03)00173-X

URL : https://hal.archives-ouvertes.fr/hal-00926118

. Doyen, L. Doyen, and O. Gaudoin, Modélisation de llefficacité de la maintenance des systèmes réparables Synthèse bibliographique, 2004.

J. Godjevac, Idées nettes sur la logique floue, 1999.

D. E. Goldberg, Genetic algorithms in search, optimization and machine learning, 1989.

E. M. Goldratt and J. Cox, Le but : un processus de progrès permanent, AFNOR, 2006.

Z. Hajjej, S. Dellagi, and N. Rezg, An optimal production/maintenance planning under stochastic random demand, service level and failure rate, IEEE International Conference on Automation Science and Engineering, pp.292-297, 2009.
URL : https://hal.archives-ouvertes.fr/inria-00600922

J. H. Holland, Adaptation in Natural and Artificial Systems, 1975.

B. Iung, M. Vérona, M. C. Suhnera, and A. Muller, Integration of Maintenance Strategies into Prognosis Process to Decision-Making Aid on System Operation, CIRP Annals, vol.54, issue.1, p.58, 2005.
DOI : 10.1016/S0007-8506(07)60037-7

URL : https://hal.archives-ouvertes.fr/hal-00156627

. Jayabalan, V. Jayabalan, and D. Chaudhuri, Optimal maintenance???replacement policy under imperfect maintenance, Reliability Engineering & System Safety, vol.36, issue.2, p.165169, 1992.
DOI : 10.1016/0951-8320(92)90096-4

V. Jayabalan and D. Chaudhuri, An heuristic approach for finite time maintenance policy, International Journal of Production Economics, vol.27, issue.3, p.251256, 1992.
DOI : 10.1016/0925-5273(92)90099-S

M. Ji, Y. He, and T. C. Cheng, Single-machine scheduling with periodic maintenance to minimize makespan, Computers & Operations Research, vol.34, issue.6, p.17641770, 2007.
DOI : 10.1016/j.cor.2005.05.034

R. Jiang, An accurate approximate solution of optimal sequential age replacement policy for a finite-time horizon, Reliability Engineering & System Safety, vol.94, issue.8, p.12451250, 2009.
DOI : 10.1016/j.ress.2009.01.003

S. M. Johnson, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, vol.1, issue.1, p.6168, 1954.
DOI : 10.1002/nav.3800010110

]. R. Karp, Reducibility Among Combinatorial Problems, Complexity of Computer Computations, pp.85-103, 1972.
DOI : 10.1007/978-1-4684-2001-2_9

J. P. Kenné and A. Gharbi, Stochastic optimal production control problem with corrective maintenance, Computers and Industrial Engineering, vol.46, p.865875, 2004.

M. Kijima, H. Morimura, and Y. Suzuki, Periodical replacement problem without assuming minimal repair, European Journal of Operational Research, vol.37, issue.2, 1988.
DOI : 10.1016/0377-2217(88)90329-3

M. Kijima, Some results for repairable systems with general repair, Journal of Applied Probability, vol.26, p.89102, 1989.

M. Lebold and M. Thurston, Open Standards for Condition- Based Maintenance and Prognostic Systems, Proceedings of the 5th Annual Maintenance and Reliability Conference, 2001.

V. Leg{t, ?. H. ?aludov{, V. ?ervenka, and V. Jur?a, Contribution to optimization of preventive replacement, Reliability Engineering and System Safety, vol.51, issue.3, p.259266, 1996.

J. Léger, La Sûreté Industrielle, la Maintenance Prévisionnelle et les NTIC : innovation du progiciel CASIP et perspectives de développement, 1ère édition du colloque international francophone « PErformances et Nouvelles TechnolOgies en Maintenance » PENTOM3), 2003.

D. Lin, M. Zuo, and R. C. Yam, GENERAL SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE MODELS, International Journal of Reliability, Quality and Safety Engineering, vol.14, issue.03, p.253266, 2000.
DOI : 10.1002/1520-6750(198908)36:4<419::AID-NAV3220360407>3.0.CO;2-5

H. H. Liu and P. Lyonnet, Optimal Periodic Preventive Maintenance Policy( with Warranty for Finite Time Span Mémoire de Master. Department and Graduate Institute of Industrial Engineering and Management, La maintenance : mathématiques et méthodes. Edition Tec et Doc, 2000.

P. Lyonnet and M. A. Malik, Ingénierie de la fiabilité Edition Tec et Doc Reliable preventive maintenance scheduling, AIIE Transactions, vol.11, issue.3, p.221228, 1979.

S. Martello, P. Et, and . Toth, Knapsack Problems: Algorithms and Computer Implementations, 1990.

S. Martorell, A. Sanchez, and S. Vicente, Age-dependent reliability model considering effects of maintenance and working conditions, Reliability Engineering & System Safety, vol.64, issue.1, 1931.
DOI : 10.1016/S0951-8320(98)00050-7

P. Mcmullan and B. Mccollum, Dynamic Job Scheduling on the Grid Environment Using the Great Deluge Algorithm, Parallel Computing Technologies, p.283292, 2007.
DOI : 10.1007/978-3-540-73940-1_29

A. Muller, Contribution à la maintenance prévisionnelle des systems de production par la formalization ddun processus de prognostic, Thèse de doctorat, 2005.

B. Naderi, M. Zandieh, and S. M. Ghomi, A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling, Journal of Intelligent Manufacturing, vol.180, issue.3, 2008.
DOI : 10.1080/05695557908974469

T. Nakagawa, Optimum Policies When Preventive Maintenance is Imperfect, IEEE Transactions on Reliability, vol.28, issue.4, p.331332, 1979.
DOI : 10.1109/TR.1979.5220624

T. Nakagawa, Periodic and Sequential Preventive Maintenance Policies, Journal of Applied Probability, vol.23, issue.2, p.536542, 1986.

T. Nakagawa, Sequential imperfect preventive maintenance policies, IEEE Transactions on Reliability, vol.37, issue.3, p.295298, 1988.
DOI : 10.1109/24.3758

T. Nakagawa, Maintenance Theory of Reliability, 2005.

T. Nakagawa and S. Mizutani, A summary of maintenance policies for a finite interval, Reliability Engineering & System Safety, vol.94, issue.1, p.8996, 2009.
DOI : 10.1016/j.ress.2007.04.004

M. Nawaz, E. E. Enscore-jr, and I. Ham, A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega, vol.11, issue.1, p.9195, 1983.
DOI : 10.1016/0305-0483(83)90088-9

I. H. Osman and C. N. Potts, Simulated annealing for permutation flow-shop scheduling, Omega, vol.17, issue.6, p.551557, 1989.
DOI : 10.1016/0305-0483(89)90059-5

S. Özekici, Optimal maintenance policies in random environments, European Journal of Operational Research, vol.82, issue.2, pp.283-294, 1995.
DOI : 10.1016/0377-2217(94)00264-D

H. Pham and H. Wang, Imperfect maintenance, European Journal of Operational Research, vol.94, issue.3, p.425438, 1996.
DOI : 10.1016/S0377-2217(96)00099-9

M. L. Pineido, Planning and Scheduling in Manufacturing and Services, Series in Operations Research and Financial Engineering, 2005.
DOI : 10.1007/978-1-4419-0910-7

N. Rezg, X. Xie, and Y. Mati, Joint optimization of preventive maintenance and inventory control in a production line using simulation, International Journal of Production Research, vol.42, issue.10, 2004.
DOI : 10.1080/07408179308964270

T. J. Ross, Fuzzy Logic with Engineering Applications, 2004.
DOI : 10.1002/9781119994374

R. Ruiz and C. Maroto, A comprehensive review and evaluation of permutation flowshop heuristics, European Journal of Operational Research, vol.165, issue.2, p.474494, 2005.
DOI : 10.1016/j.ejor.2004.04.017

R. Ruiz, C. Maroto, and J. Alcaraz, Two new robust genetic algorithms for the flow-shop scheduling problem, International Journal of Management Science, vol.3, p.461476, 2006.

S. M. Suliman, A two-phase heuristic approach to the permutation flow-shop scheduling problem, International Journal of Production Economics, vol.64, issue.1-3, p.143152, 2000.
DOI : 10.1016/S0925-5273(99)00053-5

H. Wang, A survey of maintenance policies of deteriorating systems, European Journal of Operational Research, vol.139, issue.3, p.469489, 2002.
DOI : 10.1016/S0377-2217(01)00197-7

M. Widmer and A. Hertz, A new heuristic method for the flow shop sequencing problem, European Journal of Operational Research, vol.41, issue.2, p.186193, 1989.
DOI : 10.1016/0377-2217(89)90383-4

R. H. Yeh, K. C. Kao, and W. Chang, Optimal preventive maintenance policy for leased equipment using failure rate reduction, Computers & Industrial Engineering, vol.57, issue.1, p.304309, 2009.
DOI : 10.1016/j.cie.2008.11.025

L. A. Zadeh, Similarity relations and fuzzy orderings, Information Sciences, vol.3, issue.2, p.177200, 1965.
DOI : 10.1016/S0020-0255(71)80005-1

L. A. Zadeh, Outline of a New Approach to the Analysis of Complex Systems and Decision Processes, IEEE Transactions on Systems, Man, and Cybernetics, vol.3, issue.1, p.2844, 1973.
DOI : 10.1109/TSMC.1973.5408575

X. Zhou, L. Xi, and J. Lee, Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation, Reliability Engineering & System Safety, vol.92, issue.4, p.530534, 2007.
DOI : 10.1016/j.ress.2006.01.006